Critical Path [Audiobook] download free by R.Buckminster Fuller

Critical Path Audiobook download free by R.Buckminster Fuller
  • Listen audiobook: Critical Path
  • Author: R.Buckminster Fuller
  • Release date: 2002/1/6
  • Publisher: GRIFFIN PUBLISHING
  • Language: English
  • Genre or Collection: Society and Social Sciences
  • ISBN: 9780312174910
  • Rating: 7.11 of 10
  • Votes: 556
  • Review by: Jairo Glass
  • Review rating: 7.56 of 10
  • Review Date: 2018/9/17
  • Duration: 6H21M21S in 256 kbps (102.4 MB)
  • Date of creation of the audiobook: 2018-07-10
  • You can listen to this audiobook in formats: FLAC, Shorten, AIFF, MP3, WAV, WMA, MPEG4 (compression ZIP, TAR.GZ, RAR, TZO, LZMA)
  • Total pages original book: 512
  • Includes a PDF summary of 48 pages
  • Duration of the summary (audio): 34M45S (9.6 MB)
  • Description or summary of the audiobook: Critical Path is R. Buckminster Fuller's masterwork - the summing up of a lifetime's thought and concern - as urgent and relevant as it was upon its first publication over 20 years ago. Critical Path details how humanity found itself in its current situation - at the limits of the planet's natural resources and facing political, economic, environmental, and ethical crises. Fuller's analysis has been proven correct in many areas since then and his options for the survival of mankind are as compelling as ever. Critical Path is an essential text for any student of humanity.
  • Other categories, genre or collection: General & World History, Classical History / Classical Civilisation, Philosophy, Society & Culture: General, Western Philosophy, From C 1900 -
  • Download servers: FreakShare, Mediafire, TinyUpload.com, MyUpload, Torrent, FileServe. Compressed in ZIP, TAR.GZ, RAR, TZO, LZMA
  • Format: Paperback
  • Approximate value: 26.11 USD
  • Dimensions: 156x235x28.19mm
  • Weight: 562.45g
  • Printed by: Saint Martin's Griffin,U.S.
  • Published in: California, United States

Download audiobook in:



Option 0

Option 1

Option 2

Option 3

Vote:

More audiobooks of the publisher GRIFFIN PUBLISHING

More audiobooks of the genre or collection Society and Social Sciences